Graphite past producer · Clay County, Alabama
first production 1917
Drawn as a small mine; the records don't say whether it was worked from the surface or underground. The ore color stands for graphite. Federal records note the kind of operation and its status, not its depth or layout, so this is a typical example rather than a survey of this site.
| State | Alabama |
| County | Clay |
| Coordinates | 33.34043, -85.81802 |
| Primary | Graphite |
| Tertiary | Mica, Vanadium |
| Status | Past Producer |
| First Production | 1917 |
| Data Source | USGS MRDS |
| Source ID | 10079565 |
| Site | Distance | Commodity | Status |
|---|---|---|---|
| Peerless Mine | 0.2 mi | Graphite | Past Producer |
| Carbon Mountain Mine | 0.5 mi | Graphite | Past Producer |
| A B C Railroad Cuts | 0.9 mi | Graphite | Prospect |
| Robinson Prospect | 0.9 mi | Mica | Prospect |
| Gopher Mine | 1.2 mi | Mica | Past Producer |
| May Mine | 1.4 mi | Mica | Past Producer |
| Shirley-Gopher Mine | 1.5 mi | Mica | Past Producer |
| Crystalline Flake Mine | 1.5 mi | Graphite | Past Producer |
| Pyriton Mines | 1.7 mi | Iron, Sulfur | Past Producer |
| Pyriton Mines | 1.7 mi | Sulfur | Past Producer |
| National Pyrite & Copper Co. Mine | 1.8 mi | Sulfur, Sulfuric Acid | Past Producer |
| Monitor Mine | 2.0 mi | Graphite | Past Producer |
This mine is a past producer — it was once operational but is no longer actively mining. Past producer sites may still have environmental impacts including disturbed land, tailings piles, and potential water quality effects. Some past producer sites have been reclaimed, while others remain as-is. Check with your state mining or environmental agency for current site conditions.